Projects

Our companies have implemented the following projects:

 

  • - Construction of sewage system and storage reservoirs in A1 “Piekary Śląskie – Maciejów” project;
  • - Construction of sewage system in S8 “Wrocław Psie Pole – Oleśnica” project;
  • - Construction of storage and infiltration reservoirs in S8 “Wrocław Psie Pole – Oleśnica” project;

 

Other tasks carried out at present:

  • - Performance of storage reservoirs, assembly of rainwater sewage system, construction of longitudinal drainages in the “Construction of S8 Dual Carriageway Kępno – Wieruszów” project.
  • - Performance of rainwater sewage system and longitudinal drainages in the “Construction of S8 Dual Carriageway Wieruszów – Walichnowy” project.
  • - Performance of the largest storage reservoir in Poland (while constructing rainwater sewage system in road projects) with the length of 200 m and the width of 37.5 m in the “Construction of S8 Dual Carriageway Złoczew – Sieradz” project.
  • - Performance of storage reservoirs in the “Construction of S8 Dual Carriageway Sieradz – Łask” project.